By Foster Boline Group
A builder's contract is the one document that decides who pays when plans change, schedules slip, or something fails after closing. Most purchasers sign it with excitement and read it in a hurry. We help Knoxville shoppers slow that process down so every page gets a fair look. Our guide covers the items we flag most often, and it is general information rather than legal advice.
Key Takeaways
- Scope and specs: Plans, finishes, and allowances should be written out in detail so nothing is left to memory.
- Payments and deposits: Deposit size, draw schedule, and refund terms deserve close reading.
- Schedule and delays: Completion dates need clear definitions and fair rules for weather and supply delays.
- Warranty and disputes: Coverage limits and dispute steps matter as much as the price.
Scope, Plans, and Allowances
Scope Items to Confirm
- Plans and specifications: Attached drawings should list square footage, ceiling heights, and structural options.
- Allowances: Dollar amounts for flooring, lighting, and appliances show what upgrades will cost beyond the base price.
- Lot and site work: Site grading, driveways, retaining walls, and utility connections should be listed as included or excluded.
Deposits, Draws, and Payment Terms
Payment Questions to Ask
- Deposit handling: Ask who holds the deposit and under what conditions it is refundable.
- Draw schedule: Payments tied to completed stages protect the owner from paying ahead of progress.
- Lien protection: Ask how the builder pays subcontractors and whether lien waivers are provided at closing.
Schedules, Delays, and Move-In Dates
Schedule Terms to Review
- Start and completion dates: Dates should be tied to events such as permit approval or lot readiness.
- Delay language: Look for clear definitions of weather, supply, and inspection delays.
- Utility connections: Confirm who arranges water, sewer, gas, and electric service, including the Knoxville Utilities Board where it serves the lot.
Warranty, Walkthroughs, and Closing Items
Checks Near the End of the Build
- Warranty terms: Note the length of coverage for workmanship, systems, and structure.
- Independent inspections: Many shoppers schedule one at the framing stage and another before closing.
- Punch list: Written lists of unfinished items should be tied to a deadline for completion.
License Status, Disputes, and Legal Review
Final Questions Before Signing
- License and insurance: Verify the builder's license and ask for proof of insurance.
- Dispute process: Mediation or arbitration clauses affect where and how a claim would be handled.
- Attorney review: A real estate attorney can explain terms and suggest edits.